8 Network Flows and Project Scheduling
Roads, pipelines, telephone circuits and supply chains are networks: nodes joined by arcs along which something flows. Many OR problems on networks are linear programmes whose constraint matrix is the node–arc incidence matrix of a directed graph, and like the transportation problem they have integral solutions and fast special algorithms. This section treats the three classical ones, shortest paths, maximum flows and minimum-cost flows, and then project scheduling by the critical path method and PERT, which is a longest-path problem on a network of activities.
8.1 Networks and minimum-cost flows
8.2 Shortest paths
8.3 Maximum flows and minimum cuts
8.4 Project scheduling: CPM
8.5 Uncertain durations: PERT
8.6 Networks in software
8.7 Practice Problems
8.2 Shortest paths
8.3 Maximum flows and minimum cuts
8.4 Project scheduling: CPM
8.5 Uncertain durations: PERT
8.6 Networks in software
8.7 Practice Problems
Questions on this section
Stuck on something here? Ask below and it stays attached to this topic.